Risk Assessment - Park Location

 

Production Risk Assessment

The Production is bound by law to take reasonable care and measures to ensure that a healthy and safe working environment is created and maintained for all.  Failure to follow appropriate Health & Safety procedures may invalidate any insurance.

 

 

Production title:

 Trouvaille Whitlock (Music Video)

 

 

Shoot Dates:

25th October 2021

 

 

 

Location this form relates to: [a separate form should be completed for each location]

 The Park (Chapelfield Gardens)

 

 

 

 

 

 

Production contact & phone:

  xxxxx xxxxxx

 

Signature of Assessor:                                        Assessment Date:

 Ameya                                                               05/10/2021

 

 

 

Notes/Comments:

 

 

 

 

 

 

 


Checklist

Using the checklist below, indicate any potential hazard relating to the activity.

 

No.

Hazard

Indicate if relevant

No.

Hazard

Indicate if relevant

1

Access Difficulties

 

 

25

Manual Handling

 

2

Alcohol / Hospitality

 

 

26

Night Operations

 

3

Animals

 

 /

27

Noise

 

4

Artist using specialist equipment

 

 

28

Portable Power Tools

 

5

Audience / Stewarding

 

 

29

Prop Hazards

 

6

Compressed Gas / Cryogenics

 

 

30

Radiation

 

7

Confined Spaces etc.

 

 

31

Risk of Infection

 

8

Crowds / Public

 

32

Scaffolds / Platforms / Stairs / Walkways

 /

9

Children / Young People

 

 /

33

Scenery Hazards – Movement, Shape, Suspended, Flown

 

10

Camera Ops. – Cranes / Cables, Remotes / Steadicam

 

 

34

Scene Dock Storage

 

11

Building Issues / Structures, etc.

 

 /

35

Smoking

 

12

Design / Construction / Materials

 

 

36

Special Assistance – Elderly / Disabled

 

13

Electricity / Electrical Appliances

 

 

37

Special Visual Effects – Snow, Smoke, Dry Ice, Rain, etc.

 

14

Excavation

 

 

38

Sporting Activities

 

15

Explosives / Pyrotechnics

 

 

39

Stunts

 

16

Fatigue / Exertion / Stress

 

 

40

Temperature Extremes – Heat, Cold

 

17

Fire / Flame

 

 

41

Vehicles / Motorcycles – Used in Filming, Artists Driving

 

18

Flammable Substances – Petrol, Paint, Sprays

 

 

42

Water – Work on or near Tanks / Boats / Diving / Use in Studio

 

19

Flight – Aircraft, Balloon, Parachutes

 

 

43

Weapons – Firearms, Sharps, etc.

 

20

Food Preparation

 

 

44

Work at Height – Ladders, Roof, Steps, etc.

 

21

Glass

 

 

45

Working Overseas

 

22

Hazardous Substances – Dusts, Vapours, Fumes, Corrosives, etc.

 

 

46

Weather – Extremes

 

23

Lasers / Strobes

 

 

47

Possible Violence

 

24

Lifting Equipment – Fork Lift, Trucks, Cranes

 

48

Other

 

Evaluation and Controls

For each hazard identified in the checklist, state who is at risk (crew / public / audience / artist / etc.),

the nature of the risk, and how it will be controlled.

 

Identify the likelihood of the hazard taking place and the severity of the hazard as High, Medium, Low.

Likelihood: Almost Certain;  Probable;  Possible;  Remote;  Improbable

Severity: Multiple fatality;  Fatality;  Major injury;  Minor injury;  Negligible impact

 

Hazard No.

Who is at Risk

Risk

Low

Medium

High

Control Measure

 3

 Possiblity the actors

 Possible dogs around the park, might complicate filming

Likelihood- possible

 /

 

 

 Go to the less public area of the park, less likely to find complications.

 

 

 

 

 

 8

 either public and/or actors

 Members of the public around, may get in the background of the shot and not want to be in it. Could cause disstractions

 /

 

 

 Again try to stay away from the public also hopfully the hours we are going there, there should be less people.

 

 

 

 

 

 

 

 9

 the children/actors

 There may be children around the park/running or playing

 /

 

 

 Hours while filming at the park should help to not have children around.

 

 

 

 

 

 

 

 11

 the actors

 the bandstand, may be used in the video so actors could slip on the stair up to it if it's was previously raining.

 /

 

 

 Check the condition of the structure before using.

 

 

 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

Comments

Popular Posts